- Configurable for your application needs!
- Requires Mark-10 Motorized Test Stand Before Purchase
Dynamically adjusts the crosshead position to maintain a programmed load for an indefinite or specified period of time.
Requires:
- Series 7 or 5 force gauge with load cell
If a specified time is required:
- 25303-25 (AF014) cycling / dwell time option
- 25303-16 (09-1214) interface cable